Synopsis of Stone
Column Construction
Design and construction of Stone Column(Gravel Pile).
Construction of drilling pile.
Percussion method of P.C. and steel pile.
Construction of highway and bridge.
Construction of buildings.
--Photos
BAUER BF20 BOTTOM FEED With
VIBTATOR TR85 for Stone Column
Construction : 2 sets and 1 Vibrator TR85
addition
150Hp driving motor : 2 sets
TMH 100P machine for pile percussion
or drilling method : 1 set
2M3 giant shovel : 2 sets
LeROI EQ-750DCU compressor : 2 sets
Construction of Stone Column in Formosa Mai-Liao Plant.
  Project of Stone Column in TAIPEI HARBOUR.
  CHIA-CHUN D/S Building construction of TAIWAN POWER COMPANY.
  Project of PEI JIN Transformer Station of T.P.C.
  The Environment Park construction in PIN-TUNG area
  The project of industry and commerce exhibition center and music hall in Kaohsiung City.
  Engineering of 100P Auger.
  Taiwan High Speed Rail Project Contract C230 Stone Column Job
>>more...
TEL:07-3337156-8.¡@FAX:07-3337159.¡@Address:9th FL-2,No.81,SAN TOU STREET,KAOHSIUNG,TAIWAN,ROC.
Copyright Magic International Engineering Co., Ltd. (Shak Construction Co., Ltd.). All rights reserved.
Subsidiary company SHARK CONSTRUCTION CO.,Ltd.
TACHI CONSTRUCTION CO.,Ltd.